If you are installing a roof system drip edges and gutter aprons play the main role.
Proper gutter installation drip edge.
Drip edges have two key purposes.
Snap layout lines photo by mary beth montgomery.
How to install gutters in 8 steps 1.
It should never be installed outside the gutter i e against the fascia board.
A drip edge is designed to take advantage of those forces and along with gravity direct water into the gutter.
A drip edge or a gutter apron keeps your roof secure by filtering out all the water from the attic into the gutter.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
A drip edge has to be resistant to possible erosion and should be 36 gauge or larger.
Make sure the outer edge extends over the gutter.
Iko 2019 in the sketch above the furring strip is shown in blue.
For proper water drainage the drip edge on the rakes should always overlap the drip edge on the eaves.
Due to cohesion surface tension and other forces water droplets tend to stick to one another and to the surfaces they are on albeit slightly.
The best practice is to always install the drip edge so that it is inside the gutter.
The whole purpose is to direct the water into the gutters.
We can also relate it to gutter systems.
If it doesn t pull the drip edge out slightly from under the shingles.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
This works out.
It is best to install the drip on a warm day.
Secure the drip edge with roofing cement.
Determine what works best for your house before ordering gutters and attachments.
Direct water away from fascia.
If not installed properly this will impact the effectiveness of your whole gutter systems.